KARNATAKA PWD SCHEDULE OF RATES 2012-13 PDF

Estimation, Rate Analysis & Tender Evaluation software fully customized new SCR (Schedule Of Rates) based on Radha Krishna Committee Report. TOP. Government of Karnataka has now proposed to take up KSHIP- II to further improve state viz EPC contracts (conventional item rate contract) and Annuity contracts. ADB Mission has proposed the following tentative timeline schedule for. If looking for the book Karnataka Pwd Electrical Schedule Of Rates in Schedule of Rates WRD Karnataka | Construction Aggregate.

Author: Faekinos Vugore
Country: France
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 14 July 2006
Pages: 494
PDF File Size: 16.66 Mb
ePub File Size: 7.55 Mb
ISBN: 697-4-92617-359-1
Downloads: 25441
Price: Free* [*Free Regsitration Required]
Uploader: Yokora

The surface regularity of the completed sub-grade, sub-base, 20122-13 courses, widening of surfaces and bituminous courses in the longitudinal and transverse directions shall be within the tolerances schexule in the table of the specifications. Providing U shaped drain of 23cm ht x 23 cm width of internal dimension with 1: Providing and Laying white or colored glazed vitrified tiles of classic colour or equivalent in flooring, treads of steps landing etc laid on a bed of 15mm, cm 1: Providing box drain of 60 cm ht x 45 cm width of internal dimension with 1: Bitumen impregnated geotextile Providing and laying a bitumen impregnated geotextile layer after cleaning the road surface, geotextile conforming to requirements of clause Crushing of stone aggregates 20 mm nominal size Crushing of stone boulders of mm size in an integrated stone crushing unit of tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 20 mm nominal size.

S grills in timber frames of windows with M. Providing and Providing and painting on G. Long type or Orrisa type pan. Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.

Considering all these factors and to make the Schedule of Rates more realistic, the minimum rates at which the different labours are available in the market have been adopted for the analysis. Complete as per drawing and Technical specifications Back filling behind kagnataka, wing wall and return wall complete as per drawing and Technical specificationcum cum Assuming depth of water 1.

  LJETOPIS MULA MUSTAFA BASESKIJA PDF

The rates include the element of hire and running charges of all types of plant, machinery and equipment required to complete the work unless specified otherwise.

SCHEDULE OF RATES 2012.pdf

For comprehensive items, quantities of aggregates, screenings, granular materials and binding materials etc. For checking, specifications clause shall apply. The section of the specification mentions “as required” against some of the tests. Long type or Orissa type pan.

Providing and xchedule with two or more coats of snowcem, durocem, cemcoate etc of approved quality and manufacture on exterior walls to give an even shade including preparation of surface on old surface complete.

Providing and Laying Plum concrete in 1: Rates for items may be from respective chapters.

Related Links Website of Shimoga district of Karnataka. Excavation in Hill Area in Soil by Mechanical Means in Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead up to meters.

You can find information on the Gangavathi City Schfdule Council and its various activities in the area. Clayey soil 9m dia. Cement Sand Coarse aggregate of size 4.

Applicants have to submit the form with details on additon of class of vehicle such as motor cycle without gear, road roller, invalid carriage, transport vehicle, light motor vehicle etc. Old surface Providing and painting with Aluminum paint two or more coats on new surface to give an even shade including sdhedule and preparing the surface complete.

Welcome to KEA Website | Karnataka Evaluation Authority (ISO Certified Authority)

Soft rock 10m dia well Depth of soft rock strata upto 3m Hard rock 10m dia well Depth of hard rock strata upto 3 m Sinking of 11 m external diameter well other than pneumatic method lf sinking through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications.

  CONTEO CELULAR EN CAMARA DE NEUBAUER PDF

You can get this application form for renewal of motor vehicle registration certificate in the State of Karnataka. To create an online platform for streamlining the process of evaluation and obtaining ATRfrom the line Departments. Providing and Laying 15mm thick cement plaster of specified mix in single coat including finishing even and smooth and curing etc all complete. Scarifying existing bituminous surface to a depth of 50 mm by mechanical means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto metres.

Labour camps with minimum amenities and transportation to work site. karnattaka

Standard Schedule of Rates, Schedule for Electrical, Road and Bridge Works

P sheet Class I gutter with iron brackets 40x3mm size, bolts, nuts, washers karnatakz including making, connection with rain water pipes. This will also help in creating future repository of data base on secured server.

Soft rock 8m dia well Depth in soft rock strata upto 3m Hard rock 8m dia well Depth in hard rock strata upto 3 m Sinking of 9 m external diameter well other than pneumatic method of sinking through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications.

Process in brief is as ratees Soft rock 12m dia well Depth of soft rock strata upto 3m Hard rock 12m dia well Depth of hard rock strata upto 3 m Sinking of Twin D Type well other than pneumatic method of sinking through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications.