GSA P100 PDF

The P represents the current state of practice in designing facilities to meet GSA’s commitments, maximize the efficiency of business processes, and comply . The PBS-P version is available at http:// and at 79 FR 79 FR – Announcement of the Publication of GSA PBS-P, Facilities Standards for the Public Buildings Service.

Author: Shale Vutilar
Country: Angola
Language: English (Spanish)
Genre: History
Published (Last): 22 March 2008
Pages: 341
PDF File Size: 3.46 Mb
ePub File Size: 5.10 Mb
ISBN: 816-6-22633-832-4
Downloads: 10573
Price: Free* [*Free Regsitration Required]
Uploader: Vugor

PBS-P100 Facilities Standards for the Public Buildings Service

Metrics will validate performance goals at various phases of design and construction through total building commissioning.

It applies to design and construction of new federal facilities, major gza and alterations of existing buildings, and lease construction facilities that GSA intends to own or has the option to own. P users span the entire spectrum of building professional disciplines, and the P informs and regulates decisions made throughout a project’s life.

The people Gssa met through AGC have helped me both personally and professionally. More than 10, service providers and suppliers are also associated with AGC, all through a nationwide network of chapters.

  ALVIN TOFFLER SOCUL VIITORULUI PDF

GSA Updates P100: Facilities Standards for the Public Buildings Service

See related AGC article. Green Globes is not addressed in the PBS: Start saving, learning, and networking today.

gaa If you want to be successful, well then, you need AGC. Four levels of performance are defined throughout the P in matrices, in which ‘baseline’ performance plus all prescriptive requirements is the lowest permissible level, and it is generally commensurate with the standards of the P published in Each project may implement any combination of performance levels, in order to prioritize performance opportunities that stem from climate, site, program, mandates, and other conditions.

Facilities Standards for the Public Buildings Service.

Facilities Standards for the Public Buildings Service [March ]

General Services Administration Date: The update is available at http: Ready To Join Already a member? Strategies to meet the Guiding Principles are included in each appropriate chapter of the P This document ggsa both performance based standards and prescriptive requirements to be used in the programming, design, and documentation of GSA buildings.

For the text of the Federal Register notice, click here. Sustainability addressed in the P For the latest guidance on implementing the P00 Principles see www.

  KX-T2373MXW USER MANUAL PDF

PBS-P Facilities Standards for the Public Buildings Service | WBDG – Whole Building Design Guide

PBS provides workspace to 1. United States General Services Administration: This edition of the P represents the document’s substantial transformation from a prescriptive standard to one that contains both performance-based and prescriptive requirements.

Ggsa Domain Retrieved From: A large portion of the new standard specifies levels of performance, which allows a design team and GSA’s other professional partners to identify and implement the best strategies to meet those goals. Every contractor needs those resources and those relationships. Discount Programs Capstone Supporters. It is a mandatory standard for GSA facilities.

The three higher-performance levels are more rigorous and voluntary. It ranks among the largest holders of real estate in the United States.