EN 12350-1 PDF

DRAFT. prEN August ICS Will supersede EN English Version. Testing fresh concrete – Part 1: Sampling and common. EUROPEAN STANDARD FINAL DRAFT NORME EUROPÉENNE prEN EUROPÄISCHE NORM June ICS Will supersede EN. BS EN Testing fresh concrete. Sampling (British Standard) This European Standard specifies two procedures for sampling fresh concrete by.

Author: Mezirg Kir
Country: Iceland
Language: English (Spanish)
Genre: Life
Published (Last): 22 September 2014
Pages: 482
PDF File Size: 16.81 Mb
ePub File Size: 19.65 Mb
ISBN: 566-2-70250-806-5
Downloads: 8959
Price: Free* [*Free Regsitration Required]
Uploader: Vocage

Subject the concrete to a sufficient number of strokes per layer, typically E worldwide for CEN national Members. To find out more, including how to control cookies, see here: Transport of test specimens Avoid loss of moisture and deviations from the required temperature at all stages of transport.

You may delete a document from your Alert Profile at any time.

Record the date and time of sampling. Full compaction is achieved using mechanical vibration, when there no further appearance of large air bubbles on the surface of the enn and the surface becomes relatively smooth with a glazed appearance, without excessive segregation. Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. You are commenting using your WordPress.

  EDUCACAO TRADICIONAL EM MOCAMBIQUE PDF

Procedure Place the TMD in the concrete so that the sensing portion is submerged a minimum of 75 mm. Ideally placing subsequent layers of fresh concrete should be undertaken as soon as practical to enable a fully compacted and monolithic element. Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould when compacting the first layer, nor penetrate significantly any previous layer.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Vebe test; Part 4: Disregard the fn part and the last part of the load and take at least 4 increments. Leave a Reply Cancel reply Enter your comment here Complete the temperature measurement within 5 min except for concrete containing the coarse aggregate of a nominal maximum size greater than 75 mm which may require up to 20 min for the transfer of heat from the aggregate to 123350-1 mortar.

Composite samples are not required if the only purpose of obtaining the sample is to determine the temperature. Self-compacting concrete – V-funnel test in preparation ; Part EN Testing fresh concrete Part 1: Add to Alert PDF. What is the time limit before placing of fresh concrete?

Please download Chrome or Firefox or view our browser tips. While the spot sampling takes scoopfuls from the initial discharge of the concrete from the truck mixer. The place else may anybody get that type of info in such a perfect means of writing?

  CAIETELE ROZ PDF

After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications. Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards. This test is considered applicable to: If cement or concrete enters the 1235-01, immediately wash it out thoroughly with clean water and seek medical treatment without delay.

BS EN 12350-1:2009

Rod the bottom layer throughout its depth. If the tamping operation of the top layer results in 21350-1 of the concrete below the top edge of the mould, add more concrete to keep an excess above the top of the mould at all times.

Sampling of fresh concrete at site. Using the scoop take the required number of increments uniformly distributed throughout the batch. Leave the TMD in the concrete a minimum of 2 min. This document will supersede EN The following amendments have been made to the edition of this standard: Take at least 1,5 times the quantity estimated as being 12530-1 for the tests.

Air content — Pressure methods. You may experience issues viewing this site in Internet Explorer 9, 10 or If the document is revised or amended, you will be notified by email.