ARMY REGULATION 710-1 PDF

Army Regulation –1. Inventory Management. Centralized. Inventory Management of the Army Supply System. Headquarters. Department of the Army. scope: Purpose. This regulation prescribes Department of the Army (DA) policies, responsibilities, and procedures for integrated inventory management of Army. scope: Purpose. This regulation prescribes Department of the Army (DA) policies and responsibilities for integrated inventory management of Army materiel.

Author: Fetilar Kazragrel
Country: Mayotte
Language: English (Spanish)
Genre: Career
Published (Last): 9 April 2016
Pages: 471
PDF File Size: 20.90 Mb
ePub File Size: 12.12 Mb
ISBN: 246-7-27316-334-7
Downloads: 86388
Price: Free* [*Free Regsitration Required]
Uploader: Vular

LOT procurements will include sufficient material to be provided as GFM for repair and for piecework applica. Container is not structurally damaged and does not leak.

AR 710-1 Centralized Inventory Management of the Army Supply System

Army Central for APS—5. Exceptions are as follows:.

See chapter 6 and appendix C for APS distribution policy. Army Resource Priority List. The cost of containers used for FMS may be reimbursed. Obsolescence cost—an estimate of materiel that will become obsolete before the end of its lifecycle.

Provide management oversight of second destination transportation SDT funding. Parts ordered from DLA may be prepositioned at the organic maintenance depot to support the next 30 days of.

AR –1 – AKO US Army

Requirement category codes, page It will also document any intra-depot movement of the materiel in support of reclamation on the DA Form For example, there may be one source in the supply chain for aerospace forgings or castings that is extending PLTs not only for the Army, but for other DOD and industrial customers as well.

  BY329 DATASHEET PDF

Use the latest independent demand history as a foundation for developing an independent demand forecast in LMP.

When logistics management is transferred to an IMM of another military Service, the losing item manager will send an SPR status card with status code PV to the forecasting activity. This is reglation by converting the requirement and asset comparison to the common denominator of dollars in the stratification process.

Depot washout rate applied to unserviceable DLR stock on-hand.

In the event of an imminent attack or capture by hostile forces, the senior Army commander present has the authority to order the immediate release of APS. Cross reference relationship generator, stationary, gas enginepage 89 Table regulafion Hard target requirements 5-year forecast.

The proponent may delegate this approval au- Committee management. See details in AR — The goal is to improve communication of Army requirements and vendor production planning.

These items must be removed at the installation before disposal. Ammunition quantity multiplier codes, page 91 Table 10— Generate and transmit external functional follow-ups within the timeframes in table 2—1. The cost of picking, packing, containerizing, and second-destination freight charges.

Maintain ammunition accountability within ammunition supply points ASPs. Use intensive item management processes to forecast requirements for high demand high dollar value DLRs due to the payback in inventory accuracy and enhanced customer support When demand data are not available, engineering estimates or demand data for similar items may be used.

  ANTOINE POROT PDF

The serviceable and unserviceable assets on hand, serviceable returns beyondthe RO, and procurement due-in which exceeds the RO.

Retain what is required. For items that reach a buy position in the AY, the levels and lead times are those applicable to the last procurement forecasted to be initiated in that year.

Screen the item via the LMP standard process utilizing pass-through screening. Generate a materiel receipt transaction with the date of depot receipt, condition, and quantity of materiel received, per AR — This entry reflects projected assets as of 30 September following agmy stratification cutoff date.

At the LCMC level, it is used for categorizing the inventory into groupings and subgroupings such as funding type, lifecycle stage, reparability and weapon system application.

These regulatoon include materiel controlled by the National Security Agency. Internal functional follow-ups or notifications will require action to correct the error condition, provide the required advice, or take other action to process for any exceptional conditions.