ACI 336.1 PDF

This Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. ( mm) diameter and larger. The Contractor. ACI – Specifications for the Construction of Drilled Piers – Download as PDF File .pdf), Text File .txt) or read online. ACI Reference Specification for the Construction of Drilled Piers. standard by American Concrete Institute, 01/01/ View all.

Author: Turg Nikoshakar
Country: Panama
Language: English (Spanish)
Genre: Music
Published (Last): 1 April 2018
Pages: 301
PDF File Size: 2.88 Mb
ePub File Size: 8.84 Mb
ISBN: 465-8-93878-881-2
Downloads: 45855
Price: Free* [*Free Regsitration Required]
Uploader: Mor

Submit a program to the Owner wci quality control; e. Pig—Also called a rabbit or go-devil. Remember me on this computer. Sand content in slurry, immediately before concreting, 1 ft. Probing depends on the level of knowledge of the local geology and the extent of the prior subsurface exploration program.

Mechanical drilling equipment will normally excavate a relatively flat bottom; exceptions may include stratified sloping rock or broken rock soil interfaces. Pig—Device inserted into a tremie or pump pipe to separate the concrete from the pier excavation fluid inside the pipe.

A preconstruction conference with the successful bidder is recommended, except for small or routine projects. If you are a seller for this product, would you acii to suggest updates through seller support?

Because the design bearing value is based on certain assumptions with regard to strength and compressibility, the Design Geotechnical Engineer should decide the type and amount of testing necessary to satisfy the design assumptions.

If there is a possibility of tension, the design and spacing or staggering of splices in the vertical reinforcing should be designed according to ACI Alexa Actionable Analytics for the Web. If an zci method is specified, experience with this method is required; b.

  JORDAN RUDESS TOTAL KEYBOARD WIZARDRY PDF

Amazon Advertising Find, attract, and engage customers. CVS Roadway and A These piers need close attention because few, if any, defects can be tolerated. The probability of some defects occurring during construction is recognized in design by the relatively low values of allowable stress permitted in the concrete compared to above-ground construction.

Would you like to tell us about a lower price? Withoutabox Submit to Film Festivals. In such cases, the ADSC down-hole entry manual procedures should be required. With end bearing 2. Some field conditions, however, such as nearby existing structures, require special treatment.

Maintain proper dimension and location of reinforcing steel during concreting operations.

ACI Specification for the Construction_百度文库

End bearing—Where load is supported at the bottom of the pier. Anchorage embedment—Embedment of the anchorage system, such as anchor bolts or threaded rods, used to fasten structural components to the piers. No end bearing b. Privacy Policy Terms and Conditions. 3361. pumping through a 4 or 5 xci.

Provide site supervisor and drillers, each with a minimum of 3 years of acceptable experience in installing similar types of drilled piers. Please re-enter recipient e-mail address es. This risk becomes greater when using the slurry displacement method. Designers sometimes take into account the effects of different installation methods on their design parameters, such as reducing the allowable end bearing to allow for bottom loosening.

The center at cut-off shall axi the center as permitted in Section 3. In addition, when working with piers designed for side-resistance and without end bearing where Table 2. The other is an annular space between a permanent form liner and an oversized temporary casing installed during excavation.

  COMPLETE QASEEDA BURDA SHAREEF PDF

International Concrete Abstracts Portal

Amazon Rapids Fun stories for kids on the go. There are situations where obstructions require downsizing the shaft below the initial design diameter. Disposal of excavated material offsite is usually specified in the Contract Documents as the responsibility of the Contractor.

In rock, acceptance of the bearing stratum will often depend on a predetermined seam criteria to be used in evaluating probe holes drilled to confirm rock stratum. Work is the result of performing services, furnishing labor, and furnishing and incorporating materials and equipment into the construction in accordance with the Contract Documents.

Concrete for use in the slurry displacement method Section 3. The size and amount of seams found enables the determination of the soundness of the soil formation. Any general contractor desiring to subcontract the drilled pier work should ensure that the proposed subcontractor has fulfilled those requirements.

Check the concrete level before, during, and after withdrawing casing to confirm that separation of shaft concrete has not occurred. The anchorage can then be set under more closely controlled conditions. Mix, store, and transport slurry using equipment made for these purposes.

Methods that are not axi with the design intent will be rejected. In the first case, a cement-mix-fluid grout that can be pumped under pressure through a 1 to 2 in.